Applications
Majestic Data Centres and AI
A data centre is a building full of metal. Copper through the power distribution, busbars, cabling and cooling. And none of it stays installed for long. Enterprise hardware refreshes every three to five years, and AI is shortening that cycle. The largest capital buildout in modern computing is, on a defined timetable, the largest incoming stream of high-grade recoverable material the industry has seen.
AI infrastructure is now a primary driver of global copper and precious metals demand, at a moment when new mines take a decade or more to build. Recovery is the only lever that works on the timescale of the buildout: metal from a decommissioned rack re-enters the supply chain in weeks – and unlike exploration, refresh cycles are known years in advance.
We are at both ends of the cycle: the recovered metal that helps build this infrastructure, and the equipment we recover when it comes out.
Partner with us
For data centre operators, colocation providers, hyperscalers, ITADs and hardware lessors.
Data security first. Documented chain of custody from rack to refinery, alongside your data destruction requirements.
Full audit trail. Permits, shipment notification and Basel procedure carried as standing infrastructure, with the documentation your reporting requires.
Value returned, not lost. Priced on assayed content, with two decades of grading data behind the valuation.
Circularity you can evidence. Material tracked back into global supply chains, supporting scope 3 and circular-economy reporting.

